Ganttpad: break a project into a WBS, give it dates and links, and draw the Gantt chart in your browser

Updated 2026-11-10

Ganttpad

Open Ganttpad

What Ganttpad is

Ganttpad is a Gantt chart and WBS planner that runs in your browser. Break a project into tasks and sub-tasks, give each one a start and a length in working days, and you get a numbered task table on the left and bars on a calendar on the right. Link tasks so that one waits for another and a late task pushes everything after it; the progress line and the critical path show at a glance where the plan is slipping.

There is nothing to install and no account, it is free, and there are no ads in the tool. Every export and printing is free too, with no limits. It speaks Korean, English, Japanese and German. Your projects stay in this browser on this device and nothing is uploaded.

Create a project

The first time you open Ganttpad there is an empty project ready. Put in the first task with “Add task”, or look around an example first with “Open an example”: it has links, summary rows and the progress line at work. The project name button at the top left (the folder icon) opens the list of projects on this device, and “New project” there makes another one.

A new project starts with settings that suit the language you use: in English, no public holidays and weeks that start on Sunday; in Korean, Japanese or German, that country’s holidays and weeks that start on Monday. You can change all of it later in the calendar.

Tasks and sub-tasks: the WBS outline

The numbers in the task table are the WBS: top-level tasks are 1, 2, 3, the tasks under them 1.1, 1.2, and the next level 1.1.2, and they renumber themselves when you change the order or the levels. A row with tasks under it becomes a summary row that works out its own dates and progress from them: the earliest start, the latest finish and the progress weighted by working days. The outline goes up to 9 levels deep, and a project holds up to 1000 tasks.

  • “Add task” puts a new task below the selected one. Type the task name right in the table.
  • “Indent” makes a task a sub-task of the one above it; “Outdent” brings it back up a level.
  • The arrow beside a summary row collapses the tasks under it and expands them again.
  • To reorder, drag the grip at the left of a row, or use “Move up” and “Move down”. Sub-tasks move along.
  • “Edit task” opens every setting of one task. A task removed with “Delete task” comes back with “Undo” in the message that follows.

Dates, working days and the calendar

Each task has a start and a duration. The duration counts working days, not calendar days, so a 3-day task that starts on a Friday skips the weekend and finishes on Tuesday, and a start on a day off moves to the next working day. A task of 0 days is a milestone, a diamond on the chart: tick “Milestone (0 days)”. Switch the timescale with “Days”, “Weeks” and “Months”.

“Calendar” sets the working days of this project. Saturdays and Sundays are always drawn on the chart, shaded, and never hidden.

  • “Public holidays”: the holidays of Japan, South Korea and Germany are built into the app and work offline. Japan 2000–2099, worked out from the holiday law (equinoxes, substitute holidays); South Korea 2024–2030, lunar holidays such as Seollal and Chuseok, substitute holidays and election days included; Germany 2000–2099, the nine nationwide holidays. Add your German state’s own holidays as days off.
  • “Days off”: company holidays, vacations, a day the site is closed; tasks skip these days.
  • “Extra working days”: a Saturday you work, or a holiday you work through; these count as working days.
  • “Working days of the week”: tick the weekdays you work and untick one to make it a day off. “Week starts on”: weeks on the chart begin on Sunday or Monday.

Drag the bars

Type dates in the table or drag the bars on the chart. Drag the middle of a bar to move the whole task, drag its left or right end to change the start or the finish, and drag the small triangle under it to set the progress. “Undo” takes any change back.

On a phone or tablet, tap a bar to select it and then drag its handles, or long-press the bar to move it. A plain swipe scrolls the chart and never moves a bar.

Dependencies: one task after another

Links are finish-to-start: the next task starts the working day after its predecessor finishes, plus a lag in working days if you give one. A negative lag lets it start before the predecessor finishes, so the two overlap. A task can have up to 20 predecessors.

  • Type the WBS numbers of the predecessors in the “After” column: 2 means after task 2, 1.3+2 means 2 working days after task 1.3 finishes, 3-1 means starting one working day before task 3 finishes. Separate several with commas.
  • On the chart, drag the dot just after a bar onto another bar to make that one the next task.
  • Under “Comes after” in “Edit task” you can also choose predecessors, set the “Lag (days)” and remove a link.
  • A link that would make a loop, so that a task ends up waiting for itself, is refused with a message that names the tasks in the loop.
  • Move a task later and everything after it is pushed along; move it back and they return, but never before the start each of them was given.
  • Summary rows take their dates from the tasks under them, so they can’t be linked; link the tasks under them instead.

Progress, the progress line and the critical path

Set the progress in the % column or with the triangle under a bar. Turn on “Progress line” and a vertical line appears at the status date, bending at each task to where its progress has really got to; it is also called a lightning line. Where it bends left, the task is behind plan; where it bends right, it is ahead.

The status date is today unless you set another one, such as the day of the last review, under “Status date for the progress line” in “Calendar”. Turn on “Critical path” to highlight the tasks with no slack, where one day late makes the whole project finish late.

Assignees and bar colours

Type who does a task in the “Assignee” column and the name shows beside its bar too. Pick one of 9 colours per task under “Bar colour” in “Edit task” to tell teams or kinds of work apart; print and the picture use the same colours.

Several projects

The project name button opens the list of projects on this device; keep up to 100 and switch between them. Each one has “Duplicate”, “Rename” and “Delete project”, and a deleted project comes back with the “Undo” that shows right after. To plan something similar again, duplicate an old project and move its dates.

Files, CSV for Excel, pictures and Print / PDF

Everything is under “Export & print”. Every export is free with no limits, and the files are made on this device.

  • “Save project file”: a JSON file with every task, link and setting, as a backup or to open the project on another device. In the project list, “Save backup file” saves every project on this device in one file; open it with “Restore from a file…” or “Open a file…”.
  • “CSV for Excel”: one row per task with the WBS number, dates, working days, progress, predecessors and assignee. It is saved as UTF-8 with a BOM so Excel shows every letter right, with the headers in your language, and separated by semicolons when you use German, as German Excel expects.
  • “Open a CSV file…”: bring in a CSV with task name, start, finish and progress columns, headed in any of the four languages, or in that order with no header. Open it as a new project or add it to the end of this one.
  • “Chart as a picture (PNG)”: the table and chart as one image to drop into a chat or a document.
  • “Print / PDF”: landscape pages with the task table and the dates on every page. Choose to save as PDF in the print dialog to get a PDF file.

Privacy: your projects stay on this device

Everything stays in this browser on this device: projects, tasks, links and calendars. Nothing is uploaded, there is no account and no login, and there are no ads in the tool. The holidays are built into the app, not fetched from the internet. Files and PDFs are made on the device and go only where you save or send them.

Projects live only in this browser, so clearing its site data erases them. Ganttpad reminds you now and then to save a backup file, and tells you when it can’t save (private mode or full storage).

Ganttpad or Progresspad?

Progresspad is a log of hours or percent toward one long task: no dated bars, no dependencies and no WBS timeline. Ganttpad plans a whole schedule: many tasks in a WBS, dated Gantt bars and dependencies between them. Use Progresspad to watch the time pile up on one long piece of study or work, and Ganttpad to plan a project where people, tasks and dates depend on each other.

Does it hide weekends?

No. Saturdays and Sundays are always drawn on the chart, shaded, so you can see a bar skip a weekend. They just don’t count as working days; if you work weekends, tick them under “Working days of the week” or add the day under “Extra working days”.

Can I use my country’s holidays?

Japan, South Korea and Germany are built in and work offline. For any other country, leave the public holidays off and add your holidays under “Days off”; they are skipped just the same.

Are my projects uploaded?

No. Projects stay in this browser on this device, nothing is uploaded, and there is no account.

How do I move a project to another device?

Save a file with “Save project file” or “Save backup file”, get it to the other device, and open it there from the project list with “Open a file…”.

Can I print or export for free?

Yes. JSON files, CSV for Excel, the PNG picture and Print / PDF are all free, with no watermark and no limits.